A huge shoutout to the 13-strong crew of volunteers from Tauranga offices of the engineering company Vitruvius who turned out on Thursday, 21 March, 2024, to tackle some of the maintenance work that we never seem to get on top of. We are so grateful for all their mahi!
• Steps were cut into steep and slippery sections of the ATV/4-WD track that leads up to/down from the plateau lines (8-17). Crew led by Stephen TJ
• Blackberry cleared at start of Ngāmarama track; large mats of African club moss cleared from start of Pā Kererū walk (leading to Ngāmarama); pampas trimmed along part of of L6 through wetland. All-woman crew led by Alison
• East-West access track (from Line 19-23) cleared. Crew led by Rolly.
• Southeastern access track (to around ATS 22, 23) cleared. Crew led by Keith.
Pix courtesy Stephen TJ and Alison.